Sidewalk inlay in Bellingham featuring Pacific NW species. (One of two inlays.)Local kids designed the 3 vertical mosaics during a 2-day event.
The light pole bases are about 90 s.f. of mosaic, designed by local kids. It took about 6 months to fabricate these mosaic panels, and about 24 solid hours to install them. (Not including the 2 sidewalk inlays.)