New Project in Bellingham

Sidewalk inlay in Bellingham
Sidewalk inlay in Bellingham featuring Pacific NW species. (One of two inlays.)
Local kids designed the 3 vertical mosaics during a 2-day event.
Local kids designed the 3 vertical mosaics during a 2-day event.

IMG_0698 Eagle Mandala

The light pole bases are about 90 s.f. of mosaic, designed by local kids. It took about 6 months to fabricate these mosaic panels, and about 24 solid hours to install them. (Not including the 2 sidewalk inlays.)
The light pole bases are about 90 s.f. of mosaic, designed by local kids. It took about 6 months to fabricate these mosaic panels, and about 24 solid hours to install them. (Not including the 2 sidewalk inlays.)

IMG_0699

IMG_0705

What's New:

Subscribe to My Newsletter:

Select list(s):